USA & Canada · Global Resale Desk✉ [email protected]
International · Year-end buyback window open

Sell your retired servers. We buy locally — across the USA, Canada, Asia and the Middle East.

Buyback desk for enterprise server, storage and networking exits. Local pickup in the United States, Canada, India, the UAE, Singapore, Hong Kong, Malaysia, Indonesia, and wider GCC + ASEAN. In scope: data-centre closures, refresh programmes, decommissioning, M&A consolidations, divestitures, post-cloud-migration tail, lease returns and colocation exits. A single rack, a mixed lot, or a full data-centre exit — we buy it where it sits. One buyer, one point of contact, documentation matched to local requirements.

Where we buy
Global
Americas · MEA · APAC
Indicative response
1–2 days
From asset list receipt
Firm offer window
5–7 days
Held after inspection
Minimum lot
Flexible
Single rack and up
DC exit Hardware refresh Decommissioning M&A consolidation Cloud migration tail Colocation exit Lease return Surplus / overstock AI / GPU cluster
Why the next six to eight weeks matter

The timing behind a strong Q4 bid

Retired IT loses value every quarter it sits on the floor. Three reasons the window between now and fiscal year-end usually gets the strongest bid of the cycle.

01

Capex clearance

Decommissioning the current generation before year-end frees next cycle's budget and keeps depreciated hardware off the asset register for the coming reporting period.

Budget cycle
02

Clean books

Enterprise finance teams prefer retired IT to leave the balance sheet in the same reporting period as the refresh purchase. The cleaner the cut-off, the simpler the audit position.

Audit posture
03

Market timing

The first eight to ten weeks of the new year typically see early sellers clearing inventory, which softens the clearing price for anyone who waits. Indicative; pattern reported per engagement.

Secondary market
Year-end window is open now. Send the list this week to get an indicative in 1–2 working days and a firm offer inside a week.
Where we buy

Local pickup in each country we serve

No cross-border freight required on your side. Pickup is scheduled from the facility where the gear sits, by a local team, with chain-of-custody manifest signed at every transfer.

CANADA USA UAE / GCC INDIA HONG KONG SG / MY INDONESIA
Local pickup · Local documentation · Local chain-of-custody
Global
Coverage
Local
Pickup
1–2 d
Indicative
5–7 d
Firm offer
Country / RegionMetro coveragePickup
🇺🇸United States Nationwide · NYC / NJ · Dallas · Chicago · LA · Silicon Valley · Northern Virginia DC corridor · Atlanta · Phoenix · secondary metros on scheduled runs Local
🇨🇦Canada Greater Toronto · Montréal · Vancouver · Calgary · Ottawa · Edmonton · secondary metros on scheduled runs Local
🇮🇳India Mumbai · Delhi NCR · Bengaluru · Pune · Hyderabad · Chennai · Kolkata · Tier-2 metros on request Local
🇦🇪UAE & wider GCC Dubai · Abu Dhabi · Sharjah · KSA, Qatar, Bahrain, Oman, Kuwait on engagement Local
🇸🇬Singapore Nationwide · CBD · One-North · Changi / Loyang data-centre corridor Local
🇭🇰Hong Kong Kwai Chung · Tsuen Wan · Fo Tan · Kowloon Bay · island-wide tenant decomms Local
🇲🇾Malaysia Kuala Lumpur · Cyberjaya · Johor Bahru DC corridor · Penang industrial zone Local
🇮🇩Indonesia Jakarta · Bekasi · Cibitung · Surabaya · Batam Local
🌍Wider ME & SEA Saudi Arabia · Qatar · Bahrain · Oman · Kuwait · Philippines · Thailand · Vietnam · others on request On request

Facility not on this list? Send the location with the list — we route coverage based on volume.

Facility in one of these countries? Send the asset list to ✉ [email protected] or submit the RFQ form — we schedule pickup locally.
Situations we buy from

Seven engagements that make up the bulk of what we quote

If your situation matches one of these, we've seen it dozens of times. Send the asset list and the context — we move faster when we know which lane you're in.

Data-centre exit & closure

Full on-prem DC decommission after an exit decision — rack-level teardown, asset tag reconciliation, chain-of-custody-logged removal, drive sanitisation, floor-space handover.

DC EXIT · FACILITY CLOSURE · HANDOVER

Hardware refresh programme

Rolling fleet refresh that drops the outgoing generation onto the floor. We quote the retiring estate against incoming-generation purchase cycles so capex is offset in the same fiscal window.

REFRESH · CAPEX OFFSET · TRADE-IN

Post-cloud-migration tail

Workload moved to AWS, Azure or GCP — the on-prem estate still sits there carrying depreciation. Recent-generation servers, GPUs, storage and networking recover meaningful residual value if disposed within six to twelve months.

CLOUD MIGRATION · AWS · AZURE · GCP

M&A IT consolidation

Post-merger integration or divestiture separation. Duplicate infrastructure across two estates collapses into one; the surplus becomes the lot. We handle multi-site pickup and reconciled chain-of-custody across the combined footprint.

M&A · DIVESTITURE · INTEGRATION

Colocation exit

Lease-end at a colo facility or a move from Equinix / Digital Realty / NTT / ST Telemedia / Yondr to a different provider or back on-prem. Pick-up before the SLA deadline avoids holdover fees.

COLO EXIT · PROVIDER MOVE · LEASE-END

Leased server return

Operating-lease or finance-lease exit. We quote against your return-condition requirements, handle de-identification and data sanitisation, and settle before the asset reverts to the lessor.

LEASE RETURN · OPERATING LEASE · FINANCE LEASE

Surplus & overstock

Unused inventory sitting on the shelf — ordered-but-never-deployed, project cancellation surplus, excess spares, vendor-managed inventory rolloff. Boxed or unopened units typically price at the top of the condition band.

SURPLUS · OVERSTOCK · NEW-OLD-STOCK

Branch-office & lab teardown

Satellite-office IT consolidation, lab shutdown, or failed-project surplus. Smaller per-site volume than a full DC exit, but typically repeated across multiple locations — we schedule combined pickup across the footprint.

BRANCH · LAB · MULTI-SITE

AI / GPU cluster retirement

Cluster retired after a model-training run, test-bed teardown, or capacity migration to current-generation accelerators. We quote per-card and whole-system — recent-generation AI hardware (H100, H200, A100, L40S, MI300X) typically carries the highest residual value on the decommission.

AI CLUSTER · GPU · ACCELERATOR

Something else?

Branch-office consolidation, lab teardown, failed-project surplus, bankruptcy liquidation, insurance write-off recovery — all quotable. Send the context and the list.

What we buy

Full enterprise stack — whole-unit or for-parts

Working, untested, or for-parts. Rack-mount, tower, blade, components. The buyback desk has handled most enterprise classes over the years.

Rack & tower servers

  • Dell PowerEdge (R740, R640, R650, R750, R760)
  • HPE ProLiant (DL380, DL360 Gen10+)
  • Cisco UCS C-series & B-series
  • Supermicro · Lenovo · Oracle Sun

Blade & modular

  • Cisco UCS B-series
  • HPE BladeSystem · Synergy
  • Dell PowerEdge FX · MX

Enterprise storage

  • NetApp FAS · AFF
  • Pure Storage FlashArray
  • Dell EMC (Unity · Isilon · PowerStore)
  • HPE 3PAR · Nimble · Primera · IBM FlashSystem

Networking

  • Cisco Nexus · Catalyst (9000, 3000, 7000)
  • Juniper EX · QFX · MX · SRX
  • Arista 7000 · Fortinet · Palo Alto
  • HPE Aruba · F5

AI accelerators & GPUs

  • NVIDIA H100, H200 (SXM5 & PCIe)
  • NVIDIA A100, L40S, L40
  • AMD Instinct MI300X, MI250
  • Tesla V100 lots · DGX / HGX systems

CPUs, memory, drives

  • Bulk CPUs (Xeon Scalable, EPYC)
  • DDR4 / DDR5 RDIMM, LRDIMM
  • Enterprise SSD · NVMe
  • SAS / SATA HDD lots

Workstations & bulk EUC

  • Corporate laptop fleets
  • Desktop refresh lots
  • Thin / Zero clients
  • Enterprise monitors in volume

Add-in cards & optics

  • NICs · HBAs · RAID cards
  • GPUs where present
  • SFP · SFP+ · QSFP optics
  • Transceivers in bulk

Not on this list?

Send it anyway. Recent chassis, specialised appliances, legacy gear — we've handled most enterprise classes over the years.

Model or asset class not on the list? Send it anyway. Most enterprise classes are quotable, and we flag the ones that aren't honestly.
Lot size flexibility

From a single rack to a full data-centre exit.

Serverbuyback is built for bulk. In the international markets, the local pickup model lets us flex further. No fixed floor — if a lot is below a reasonable logistics floor we say so before you commit time to a list.

Full DC decomm
In scope
Multi-rack exit
In scope
Single-rack
In scope
Mixed lot
In scope
Component lots
In scope
3–5 high-value units
Case by case
Any lot size — we flex to the engagement. Single rack or a full data-centre exit. Send the list and we'll tell you honestly whether it's in scope.
How a deal runs

Six steps. No surprises in the middle.

1

You send the list

A spreadsheet works best — make, model, quantity, condition, and configuration where known. Photographs or asset-management exports also work.

Day 0
2

Indicative range

First-look indicative range inside one to two working days. The range reflects the configuration detail provided; more detail narrows the range.

Day 1–2
3

Firm offer on inspection

For lots where configuration detail is incomplete, a short physical inspection or a sample-inspection call converts the indicative range to a firm bid. Held for seven days.

Day 3–7
4

Terms signed

Pickup date, documentation list, payment method and timing all set in the signed offer before anything moves.

Pre-pickup
5

Pickup

Scheduled per engagement. Local team on-site. Chain-of-custody manifest signed at every transfer.

Day 5–14
6

Settlement & documentation

Payment per agreed terms. Per-drive Certificate of Sanitisation for every data-bearing device. Chain-of-custody manifest closed.

Post-pickup
Ready to start Day 0? Day 0 is the day you send the list. Everything else runs from there — indicative in 1–2 days, firm offer in 5–7.
C✓
Documentation

Compliance standards met wherever necessary

Two deliverables, standard on every engagement. Anything beyond — discussed per engagement.

Drive sanitisation
Aligned to NIST SP 800-88 Rev. 1 Purge. Per-drive Certificate of Sanitisation issued for every data-bearing device in the lot.
Chain-of-custody
Manifest signed at each physical transfer — from source facility to pickup vehicle to processing site. Closed at settlement with reconciliation summary.
Need a specific documentation format for internal audit? Say which regulator or review posture matters and we match the paperwork before pickup.
What raises your offer

Simple detail work on your side moves the bid materially

+
Clear asset list Make, model, exact SKU where possible, quantity, condition band. Serials on high-value items.
+
Server configuration detail CPU model, RAM total, drive count & size, presence of GPUs, RAID / HBA / NIC cards.
+
Working status flagged honestly Working · untested · for-parts. For-parts still have component value — include them.
+
Rails, caddies, bezels, PSUs Small parts that add meaningful value. Missing them doesn't kill the offer. Including them lifts it.
+
Warranty & licence status noted iDRAC Enterprise, iLO Advanced, DNA licences, FortiCare, transferable OEM warranty — all real value lines.
+
Group the whole lot Single engagement across the full decommission typically prices better than piecemeal sales.
Scope clarity

What we are not

A clear brief on scope avoids wasted conversations.

×
A retail channel
Bulk and lot-level only — not an end-user sales desk.
×
A free e-waste service
If the lot has no recoverable value we say so and point to the right destination.
×
A broker
We take title in the signed offer. Firm bid is a real commitment, not a listing.
×
A "highest price guaranteed" claim
Indicative band, firm on inspection — because that's what the market actually supports.
Frequently asked

What enterprise sellers usually ask us first

Do you take title or broker the sale?
We take title in the signed offer. The firm bid is a commitment — not a listing — and the asset is ours from the point of pickup. You get a single counterparty, not a chain of brokers.
What's the minimum lot size for international pickup?
There is no fixed floor. Full data-centre decommissions, single-rack exits, and small lots of three to five recent-generation enterprise units are all in scope. If the lot is below a reasonable logistics floor we say so before you commit time to a list.
How fast is the indicative response?
One to two working days from receipt of the asset list. The firm offer on inspection — or on sample-inspection — typically follows within five to seven working days from the indicative.
Who handles pickup logistics?
We do, from the facility where the gear sits. Scheduling is agreed in the signed offer along with payment terms. The local team manages the on-site transfer and the chain-of-custody manifest.
What documentation do we receive?
Per-drive Certificate of Sanitisation for every data-bearing device, chain-of-custody manifest signed at each transfer, and an engagement summary on request. Documentation format is matched to the jurisdiction and, where applicable, to the sector regulator in your market.
Do you buy for-parts or non-working units?
Yes. For-parts units still have component value — CPUs, DIMMs, drives, RAID cards, HBAs, PSUs, backplanes, rails. Include them in the lot rather than sending them to shred; the delta on component recovery is usually meaningful.
Do you handle warranty-active equipment differently?
Transferable OEM warranty and active support contracts can raise the bid. Flag them on the list — model, warranty end date, and whether the support contract transfers. Non-transferable warranty is neutral; it doesn't reduce the offer.
What about licences, firmware, and management controllers?
Note iDRAC Enterprise, iLO Advanced / Scale-Out, HPE SmartStorage, Cisco DNA Essentials / Advantage, FortiCare, and comparable licences on your list. These are real value lines on the firm bid.
Can we get a reference from a prior customer in our region?
On request, with written consent from the referenced customer and under NDA. Reference work takes a few working days to coordinate, so please flag it early if it matters to the procurement review.
What happens if inspection reveals materially different condition?
The firm offer is calibrated to actual condition. If inspection reveals materially better configuration than the list suggested, the firm bid moves up. If weaker, we explain the delta and you decide whether to proceed at the revised firm number or walk — no cost.

Ready to send the list?

Email the spreadsheet or PDF. Note pickup city and target timing. First-look indicative follows in one to two working days.

INDICATIVE 1–2 DAYS · FIRM OFFER 5–7 DAYS · PICKUP LOCAL

What we buyGet a Bulk Offer →